Replace with your image
   

Electric, Gas, Water and Sewer Rates
++effective_date++  
   
 
CHARGES PER FIXTURE PER MONTH  
   
 
TYPE OF FIXTURE
LAMP SIZE
RATED
ENERGY
FACILITY
TOTAL
 
WATTS
LUMENS
kwh
CHARGE
CHARGE
COST
         
LED 60
60
8000
22
++LED_60_EC++
$7.62
++LED_60_TC++
LED 67
67
9159
25
++LED_67_EC++
$6.46
++LED_67_TC++
LED 230 Cobra
230
35150
85
++LED_230_COBRA_EC++
$7.85
++LED_230_COBRA_TC++
LED 240 Cobra
120
12248
44
++LED_240_COBRA_EC++
$13.66
++LED_240_COBRA_TC++
LED 400 FLOOD
270
30000
99
++LED_400_FLOOD_EC++
$16.41
++LED_400_FLOOD_TC++
 
MERCURY VAPOR
175
7650
70
++MERCURY_VAPOR_EC++
$3.93
++MERCURY_VAPOR_TC++
OR INCANDESCENT
400
19100
155
++OR_INCANDESCENT_EC++
$5.95
++OR_INCANDESCENT_TC++
 
HIGH PRESSURE SODIUM
150
14400
63
++HIGH_PRESSURE_SODIUM_150_EC++
$4.74
++HIGH_PRESSURE_SODIUM_150_TC++
 
400
45000
165
++HIGH_PRESSURE_SODIUM_400_EC++
$7.52
++HIGH_PRESSURE_SODIUM_400_TC++
 
METAL HALIDE
250
109
++METAL_HALIDE_250_EC++
$6.32
++METAL_HALIDE_250_TC++
 
400
165
++METAL_HALIDE_400_EC++
$8.77
++METAL_HALIDE_400_TC++
 
1500
570
++METAL_HALIDE_1500_EC++
$8.46
++METAL_HALIDE_1500_TC++
 
METERED LITE - FACILITIES CHARGES ONLY    
$28.96
POLE CHARGE    
$3.00
CONSTRUCTION COST    
++CONSTRUCTION_COST++
*METAL HALIDE CONSTRUCTION COST    
$50.00
ENERGY CHARGE    
++Energy_Charge++

 

 
 
Copyright © 2008 Protected By Holly Springs Utility Department
Designed by Central Service Association